 |
Stats:
Year
Built: 2010
Builder: AC Plus Marine, Inc.
Class Society: ABS Surveyed Under construction
Design Standard: ABS & IMCA 024
Testing/Certification: ABS & IMCA 018
Present Class: CFR
Services
Required:
Electric Power (Generator
or shipboard): 480V, 60Hz, 350 Kw
Emergency Generator (less hot water): 480V, 60Hz, 200 Kw
Compressed Air: 150 cfm @ 90 psi
Seawater: 30 gpm @ 25 psi
Fresh water: 3.5 gpm @ 25 psi
Sanitation connection: 2” |
|
Main
Components:
Class Year Built
MC/DDC/TL Main Chamber ABS Surveyed: 2010
SDC/ Bell (rebuilt 2010) CFR
1977
HRC 9-man (rebuilt 2010) Float-Away CFR 1977
HRC Crash Frame and all components ABS Surveyed 2010
LARS Including Winches and HPU ABS Surveyed 2010
Support Structures and Frames ABS Surveyed 2010
SCV Saturation Control Van ABS Surveyed 2010
EV1 Equipment Van number one ABS Surveyed 2010
EV2 Equipment Van number two ABS Surveyed 2010
Main Umbilical Basket/Van ABS Surveyed 2010
Designed
and built under IMCA D 018 & D 024
All new construction was designed, built and surveyed under ABS UWS
SDC Meets IMCA D 018 with the exception of volume
HRC Meets IMCA D 018 with the exception of bunk dimensions. |
 |
|
Living Accommodations:
Main Living Chamber
(23m³) 1000fsw, 6 man
Transfer Lock (10m³) 1000fsw
HRC 4-man come-out living chamber (12.25m³) 600fsw/ 9 man HRC
Diving Bell:
Capacity
Men : 2
Diver Lockout Capability : 1
Camera Connections : 2
Volume : 2.5m³
Mating (no exterior door) : Bottom
Side Hatch (with exterior door) : Yes
Buoyancy : Negative |
Additional Equipment
Specifications:
Diver Reclaim System (Mechidyne)
overhauled with new compressors
2010 two-diver reclaim
HRC: Float-away chamber, crane off, tow only, 9-man
Main Umbilical: 300 meter
Diver 1 umbilcal: 38 meter
Standby diver umbilical: 45 meter
Diver hot water: staged electric
Conditioning Units: two 8-ton HECU’s
Temperature and humidity control: automatic control
Equipment vans equiped with dehumidifier/coolers
Haskel Gas transfer boosters: two
System is due to be upgraded to a 1000 fsw full ABS classification with
a new 3-man bell and a new HRC chamber in 2011 or 2012. |